Year
2023
City
Ankara
Duration
11 months
Area (GFA)
~12,000 m²
Summary
Steel–reinforced concrete hybrid solution in the city center with a fast manufacturing schedule.
Flexible floor modules for office levels, fire stairs and HVAC infrastructure were coordinated. The façade targeted high insulation performance.
Lift and fire-detection tests were signed off before operational handover; energy performance documentation and mechanical commissioning records were bundled in the delivery package.