Year
2022
City
Izmir
Duration
Ongoing (month 9)
Area (GFA)
~32,000 m² site
Summary
Stormwater, stabilization and landscape infrastructure to complete the site perimeter.
Drainage lines, manholes and regulated stages optimized water management. Pavement and lighting were delivered after stabilized sub-base.
The current phase covers landscape fill and stormwater tie-ins to the municipal network with coordinated site logistics; weekly progress reports are issued to stakeholders.